Building a house? Or planning on building one? If you are aged 18 or older, you can request a temporary connection.
To obtain a temporary building connection for water and electricity, you must submit the following documents:
• a notarial deed or a “written inspection” from the Land Registry Office (Kadaster), no more than a year old;
• a cadastral drawing (situation drawing);
• an extract from the Bonaire Chamber of Commerce (Kamer van Koophandel Bonaire) that has a stamp and signature and is no more than a year old.
• a valid proof of identity with a clear photograph.
• an inspection card* for the temporary electricity connection.
• a completed intent list for the infrastructural project and / or reinforce the GVB installation.
Intention list instructive project and/or reinforce GVB installation (download)

*The inspection and the completion and signing of the inspection card must be performed by a registered installer. You can obtain the inspection card from the relevant installer.

Please note:
• Are you not the owner of the plot? You must then submit a signed authorization, no more than six months old, and a copy of the owner’s valid proof of identity.
• As soon as you have submitted the application, our technical department will inspect your building site. Departmental staff will determine whether or not you are eligible for a water and/or a electricity connection.
• The costs for allotment, the connection, civil work activities and the deposit will be charged to your account.

Is the construction completed and you are about to move in? Then you can apply for a permanent connection.
Bring the following documents with you:
• an inspection card* for the permanent connection of electricity;
• the documents for your temporary connection
• the document with the official street name and address of the Public Entity of Bonaire (Openbaar Lichaam Bonaire, OLB), the Directorate of Land Planning (Directie Ruimtelijke Ordening, DRO).
• a completed intent list for the infrastructural project and / or reinforce the GVB installation.
Intention list instructive project and/or reinforce GVB installation (download)

* The inspection and the completion and signing of the inspection card must be carried out by an approved installer. You will receive the inspection card from the concerning installer.